8.57MW Solar Project at Kenya Ceramic Factory+ 查看更多
8.57MW Solar Project at Kenya Ceramic Factory
+ 查看更多
Project Description
Installation unit | SSS-Solar |
Construction address | Kenya Ceramic Factory Project Site
|
Installed capacity | 8.57MW |
Installation site | Pile Driving at Block No. 3
|
Main equipment | PV Modules, Mounting Structures, Inverters, Distribution Cabinets, etc.
|
Estimated annual power generation | Approx. 13,000,000 kWh
|
Grid connection time | 2025 |